Please read carefully the following information is included on the Reef Club Governing Documents and Rules & Regulations before undertaking a home project. Contact the Management Office if you need clarification and guidance.

XVI. RENOVATIONS AND CONTRACTORS

  • All contractors must be authorized by the office before gaining access to the Reef Club property. An Architectural Change, Renovation and Contractor form are linked to this web page. THEY ALSO may be obtained at the office. The completed form must be submitted along with a $300.00 deposit check and must be approved before starting any work.
  • All remodeling, including plumbing, electrical, structural or flooring construction, must be authorized by the office with proper proof of contractor’s license, insurance, and permits when applicable.
  • Make no alterations, decorations, repair, replacement or changes to the common elements, or any outside or exterior portions of the building, or any load bearing, supporting walls of the building whether within a unit or part of the common element.
  • The unit owner shall be liable for all damages to another unit(s), common elements or, any condominium property caused by their contractor, subcontractor or, their employees, whether said damages are caused by negligence, accident or otherwise.
  • Contractors are allowed to work on Monday through Friday from 9 am to 5:30 p.m. Work is allowed on Saturday from 9 a.m. to 5:30 p.m. as long as large tools and materials are already in the unit and their activities generate minimal noise. All contractors must be off the property by 6 p.m.
  • Request for an electrical upgrade involving changes to the limited common elements, such as the meter rooms or electrical conduits, must comply with the requirements for a permit from the City North Miami Beach. All documentation must be filed in the office, one week prior to commencement of work.
  • Soundproofing is mandatory for new flooring, following City of North Miami Beach Building Code; a permit is required.
  • Hallway floors must be adequately covered during the construction period.